Pacific Cascade Logo

TSX.V:PCV

Pacific Cascade Reports Results of 2008...

Pacific Cascade Reports Results of 2008 Exploration Program on Crack Moly Property

Vancouver, British Columbia. - Pacific Cascade Minerals Inc. (the "Company") announces the results of the 2008 Exploration Program on its 100% owned Crack Moly Property located northeast of Harrison Lake, B.C..

The company completed approximately 10 line kilometres of I.P to the west of the I.P grid of 2007. This western extension was an attempt to better define a possible anomaly at depth. 3 drill holes totalling 1300 meters were completed in the 2008 drilling program to test the geophysical anomaly shown by this IP survey. All 3 holes were drilled from the same drill pad which was located approximately 500 metres west of the end of the 2007 drill sites.

CM-08-01 was drilled to intersect a chargeability anomaly at depth. This hole intersected pyritization with no significant molybdenum mineralization.

CM-08-02 and CM-08-03 were drilled to intersect a near surface chargeability anomaly, both CM-08-02 and CM-08-03 intersected zones of silicification and associated pyritization with no significant molybdenum mineralization.

Future exploration program will return to the areas of the surface breccia pipes that returned intersections of molybdenum mineralization during the 2007 drill program.

The technical information provided in this press release was reviewed by Wesley Raven P.Geo,, a qualified person for the purposes of National Instrument 43-101.

For more information please visit www.pacificcascade.ca

ON BEHALF OF THE BOARD OF DIRECTORS,

"Harold Forzley"

Harold Forzley
President / CEO
Pacific Cascade Minerals Inc.

For more information contact Harold Forzley, President, or Stephen Millen, Corporate Communications at: Telephone: (604) 637-1341

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or the accuracy of this news release. We seek Safe Harbor.